NAVY DIVE LOCKER EXPANSION AND RENOVATION

NAVAL BASE GUAM, APRA HARBOR

This design-build project included demolition of the existing locker room, restroom, offices, and breakroom. The complete buildout of a new locker room, shower area, restrooms, breakroom and office space. Installation of moisture resistant/high impact GWB partitions on metal stud framing, non-sag paperless/moisture resistant gypsum board ceiling on metal stud framing with blanket thermal insulation and non-skid ceramic floor tile with anti-fracture waterproofing membrane. Installation of all shower stalls, toilet partitions, toilet accessories, and plumbing fixtures. This renovation included extending the building structure and subsequent interior buildout including finishes, plumbing, mechanical, fire protection, and electrical systems.