ST. PETER’S DITCH IMPROVEMENT, PHASE 4 PILING INSTALLATION

CLEARVIEW DRAINAGE PUMP STATION, JEFFERSON PARISH, LA

APC was contracted to perform deep foundation construction of the new Clearview Drainage pump station located in Jefferson Parish, Louisiana.

APC’s scope of work consisted of the complete piling installation. The job site was extremely limited due to an active high rise with exit lanes bordering the site. We mobilized a 165 ton crawler crane onsite to install concrete piles, H-piles and sheet piles for an intake basin. In addition, our team installed and removed a Temporary Restraining System (TRS) and scour protection.

  • YEAR 2016
  • WE DID Deep Foundations (Concrete, H-Pile, Steel Sheet, Auger-Cast, Timber, Limited Access, Retaining Structures & Pipe Pile), Scour Protection
  • CATEGORY ,